Where a merchandiser’s week goes
A merchandiser owns the order from RFQ to sailing. The facts live elsewhere: the T&A sheet, the ERP, the buyer’s last email, the tech pack saved on someone’s desktop.
Every buyer wants a PO status, and each one means four lookups
The buyer asks where a PO stands. To answer, the merchandiser opens the T&A sheet, the ERP order, the last production report and a long email thread, then types the reply by hand. Repeat for every hot order and every weekly WIP report. The buyer waits, the merch head is pulled into calls, and the hours meant for chasing the order are spent reporting on it.
Nearly 20%
Share of the average interaction worker’s week spent looking for internal information or tracking down colleagues who can help, by a 2012 estimate. A cross-industry figure, not specific to textiles.
Source: McKinsey Global Institute, The social economy: Unlocking value and productivity through social technologies (opens in a new tab), 2012.
A buyer’s change sent by email, never added to the tech pack
The buyer sends the tech pack, then an email that tightens a POM tolerance, then another that swaps a trim. Neither change reaches the file the sample room, cutting and QA work from. A missed change means another sample round and overtime in the sample room. If it reaches bulk, the order can fail final inspection.
35%
Share of textile and clothing suppliers in an ILO global survey who face buyer penalties for failing to meet order specifications, against 5% across all sectors. 1,454 suppliers surveyed in 2016.
Source: International Labour Organization (ILO), INWORK Issue Brief No.10: Purchasing practices and working conditions in global supply chains: Global Survey results (opens in a new tab), 2017.
The T&A is a sheet someone updates when they have time
Plan against actual is filled in by hand across dozens of orders. A lab dip approved six days late, trims four days late and a PP sample still with the buyer each look small. Together they move the cut date and ex-factory, and the merchandiser hears of it when cutting cannot start. The playbook names buyer approval milestones as the biggest source of slippage. They are also the milestones the factory controls least.
3.6 milestones
In about half of supplier ratings, buyers had missed an average of 3.6 key time-and-action milestones over the previous six months, most often in the pre-production stage. 2018 ratings cycle.
Source: Better Buying, Better Buying Index Report, Fall 2018: Purchasing Practices Performance in Apparel, Footwear, and Household Textile Supply Chains (opens in a new tab), 2018.
The slip shows up at ex-factory, when every option is expensive
When the T&A is read late, the first sign of trouble is a missed ex-factory date. By then the choices are a late shipment and the buyer’s discount, or air freight at the factory’s cost. The owner sees the margin go, and the merch head has to explain the delay to the buyer after the fact.
5–10%
Discount that Bangladeshi exporters say major buyers’ systems automatically generate when a shipment is 15 days or more late, as reported during the July 2024 shipping disruption.
Source: Apparel Resources, Bangladeshi apparel shippers experiencing delays must pay more as they resort to air freight (opens in a new tab), 2024.
What the merchandising agent does with your T&A, POs and tech packs
It answers from your T&A, POs, tech packs and sample register, and shows the records, versions and dates it used. Anything it sends or changes outside Mavick, from a buyer email to a T&A row in Google Sheets, waits for an admin to approve or decline it.
Plan against actual for any PO, from your own rows
Answers with sources
Ask where an order stands and the agent reads the T&A calendar you connected or uploaded, and the buyer’s PO on file. It lists each milestone with planned and actual dates, marks the ones two or more days late (the playbook’s line for a slip) and walks back to the first one that slipped. It shows the T&A rows and the PO it read.
Ask“Where does PO 4471 stand against its T&A? Which milestones are two or more days late?”
The tech-pack version that counts, quoted with its date
Reads your documents
Upload every tech-pack version to the department. When you need a measurement, a trim or the label pack, the agent quotes the current version and the date it read. Ask what changed between v3 and v4 and it sets the sections you name, such as measurements, trims, construction or packing, side by side, with each file’s version and date. Sections you do not name are not compared. The buyer’s file stays exactly as sent.
Ask“What does the current tech pack say about the neck rib height and its tolerance? Give the version and date.”
The weekly buyer summary, built from what is on record
Creates files
The agent builds the playbook’s weekly buyer-wise summary as a real sheet: POs confirmed, in production and shipped, and open issues with owners and ETA. Where a figure is not on record, it says so rather than filling the gap. Ask it to change one column and it edits that part; every revision is kept and attributed.
Ask“Make this week’s summary for this buyer as a sheet: POs confirmed, in production and shipped, and open issues with owners.”
Samples out with the buyer, counted and followed up
Acts in your tools
From your sample dispatch register, the agent lists the samples still with the buyer and the date each was dispatched, oldest first. For the follow-up, it writes the email to go out through Gmail or Outlook, or a WhatsApp Business message to the buyer’s merchandiser. It waits in Mavick until an admin approves or declines it, and it is sent only if approved.
Ask“Which samples for this buyer are still out? Draft a polite follow-up on the oldest lab dip.”
A PO amendment, set against the T&A and confirmed in writing
Acts in your tools
When the buyer amends a PO, upload the amendment. The agent sets the new ship date against the T&A milestones still to come and lists any that no longer fit. It writes the confirmation to the buyer, to go out through Gmail or Outlook, and, if your T&A is a Google Sheet, the matching date change. An admin approves or declines each one, and it runs only if approved.
Ask“The buyer’s PO amendment moves the ship date for PO 4471 to the 28th. Check it against the T&A and draft the confirmation to the buyer.”
Three moments in a merchandiser’s week
Before the weekly buyer call
Merchandiser
The buyer’s weekly call is in an hour, and she will ask about every open order.
Asks
“Which of this buyer’s orders ship this month? Show quantity, the current stage, and whether each ship date still holds on the dates we have.”
The agent
Reads this buyer’s POs on file and the milestones in the T&A sheet. Lists each PO with its quantity, the last milestone done, any milestone two or more days late, and whether the remaining planned dates still fit the ship date. Where a date is missing from the records, it says so instead of guessing, and it shows the files and rows it read.
Result
One table for the call, with a source behind every date and the gaps named before the buyer finds them.
A new tech pack with no change note
Assistant merchandiser
The buyer sends tech pack v4 the day before the PP meeting, with no note on what changed.
Asks
“Compare tech pack v4 for this style with v3 on POM tolerances, trims, care labels and carton marks. Show each side by side.”
The agent
Searches both versions in the department’s documents for the sections the team asked about, such as a POM tolerance, a care label or a carton mark, and sets the passages from each side by side, quoting the version and date of each file. Builds the comparison as a document the team can take into the PP meeting. Both tech packs stay exactly as the buyer sent them.
Result
The PP meeting works from the named sections of v3 and v4 side by side, each with its version and date, and the next sample is made to v4.
A late trim puts the sailing at risk
Senior merchandiser
Trims for a PO came in six days late, the PP sample is still with the buyer, and the sailing is three weeks away.
Asks
“This order is running late. Find where it first slipped and what sits after it, then draft a note to the buyer. Planning has confirmed the new ex-factory as the 14th.”
The agent
Walks back through the T&A rows to the first milestone that slipped, with its planned and actual dates, and lists the milestones after it. Writes the email to the buyer, to go out through Outlook, with the new ex-factory date you gave it and the milestone dates as recorded.
Approval
The email waits as an action. The merchandising head, as department admin, approves or declines it. It is sent only if approved, and the decision is kept in the audit trail.
Result
The head decides on a written notice, with the dates on record, three weeks before the sailing instead of after ex-factory. The playbook asks for that notice no later than seven days before the original sailing.
What a slipped order costs, and what to measure
The figures below are published industry figures on air freight, buyer specifications and POs, cited at the source. They are not Mavick results. A pilot measures your own shipment and sample numbers against the scorecard.
Fewer orders that leave by air
$30,000
Textile Today’s 2019 example: an exporter pays about $30,000 to air-freight 10 tonnes of garments from Dhaka (at $3 a kg to London), against $1,200–1,500 for a 20-foot container paid by the buyer.
How the agent helps
When you ask, the agent compares planned and actual dates for each open order and walks back to the first slip, so a late milestone can be raised while there is still time to act. It drafts the early notice to the buyer; an admin approves or declines it, and it is sent only if approved.
Track: On-time shipment % by buyer-quarter
Source: Textile Today, Destructive penalties of air shipment of apparels (opens in a new tab), 2019.
Fewer sample rounds made to the wrong spec
41%
Share of suppliers in an ILO global survey who said inaccurate technical specifications from buyers led to extra overtime. The brief ties unclear specs to excess sampling and extra costs. All sectors, 2016.
How the agent helps
The agent quotes the current tech-pack version with its date, puts the clauses you ask about from two versions side by side, and sets the buyer’s last comment from the sample card beside the tech-pack clause it refers to, so the sample room can check it is working from the current version.
Track: First-pass sample approval rate
Source: International Labour Organization (ILO), INWORK Issue Brief No.10: Purchasing practices and working conditions in global supply chains: Global Survey results (opens in a new tab), 2017.
POs checked against what was agreed, before you confirm
23.6%
Share of suppliers who said fewer than 90% of their POs were accurate. A PO that differs from verbal and email commitments delays production while it is revised and reconfirmed.
How the agent helps
Upload the PO with the buyer’s emails and the costing sheet. The agent sets each term of the PO beside what they say: ship-to, incoterm, quantity per size and colour, ship date, payment terms. It also checks the BOM against the costing sheet for a missing trim, an item on the playbook’s pre-PO-confirmation checklist.
Track: Order-confirmation latency, PO to confirm
Source: Better Buying, Better Buying Index Report, Fall 2018: Purchasing Practices Performance in Apparel, Footwear, and Household Textile Supply Chains (opens in a new tab), 2018.
What to baseline before a pilot
Measure each one before the pilot starts, then again at its end.
| KPI to baseline | Why it matters |
|---|---|
| On-time shipment % by buyer-quarter | The number buyers hold you to. The playbook targets 95% or better and calls for a buyer-level review below 90%. |
| T&A slippage rate: orders more than two days late on any milestone | It counts the orders that are slipping while the ship date still holds, which on-time shipment % only shows after the sailing. |
| First-pass sample approval rate | Each extra round costs sample-room hours, courier fees and days on the T&A. The playbook targets 85% or better; under 70% points to tech-pack reading or sample-room work. |
| Order-confirmation latency, PO to confirm | The playbook’s target is three working days or fewer. Beyond five, the order starts to lose its booked slots with yarn, fabric and trim suppliers. |
| Buyer claim rate as % of shipped FOB | Where spec and packing mistakes end up. The playbook targets under 0.5%; above 1.5% it reads as a quality, spec or packing problem. |
| Costing accuracy, post-cost against pre-cost | Shows whether the margin quoted at RFQ survives the order. The playbook targets ±2%; a gap above 5% triggers a root-cause review. |
What the agent works from
Records it reads
- Tech pack
- BOM
- Costing sheet
- Buyer PO
- PO amendment
- T&A calendar
- Sample dispatch note
- Sample card
In your ERP
Reads Odoo stock transfers (transfer, partner, status, scheduled date, source document) with the time fetched, and can draft a note or source document on one for an admin to approve or decline. That is all the ERP gives Merchandising: buyer POs and the T&A come from uploaded files, mail and Google Sheets. The demo shows which transfers your Odoo holds.
One ERP connection serves the whole factory: SAP Business One, SAP S/4HANA, Odoo, Oracle NetSuite, Microsoft Dynamics 365, WFX Cloud ERP or Datatex NOW. This agent reads only the records named above; we check yours on the call.
In your tools
Reads the buyer’s emails in Gmail or Outlook when you ask. Drafts buyer replies, status updates and sample follow-ups, prepares milestone-date updates in a T&A kept in Google Sheets, and writes WhatsApp Business messages to the buyer’s merchandiser or Slack messages to your own team. An admin approves or declines each write; it runs only if approved.
Tools named today: Gmail, Outlook, Google Sheets, Slack and WhatsApp Business.
Never made up
- PO numbers, quantities, prices or ship dates
- Tech-pack measurements, tolerances or construction details
- Buyer approvals, comments or sample verdicts
- T&A milestone dates
If it is not in your connected data, the agent says so.
Belongs to another department
- Yarn, fabric or trim purchase prices and vendor termsSourcing & Procurement
- Landed cost build-ups and marginCosting & Pricing
- Export documents and shipping bookingsLogistics & Shipping
- Sewing-line output and line efficiencyGarmenting & Stitching
- Knitting-machine output on the fabric floorKnitting
- Loom output on the weaving floorWeaving
What the Merchandising playbook covers
The two-day rule on the T&A
Update plan against actual for every milestone each working day. A milestone two or more days late goes to the merch head and Planning. One that puts the ship date at risk goes to the plant head and to the buyer, no later than seven days before the original sailing.
A price change after the PO is confirmed
If the buyer changed the style, re-cost, send a revised costing sheet and get a PO amendment before production changes. If the cost moved on the factory side, record anything over 1% of FOB and tell Costing; over 5% goes to the Costing manager and Commercial head with a one-page delta calc. Never absorb more than 1% silently.
T&A slippage rate, and how to read it
The share of orders more than two days late on any milestone. The playbook’s target is under 10%. Above 20%, the playbook reads it as PPC over-committing, or yarn, fabric or trims arriving late again and again.
A sample “almost approved” for three rounds
The buyer is rarely commenting on the literal change. The playbook says to stop iterating and ask the buyer’s technical team, in one sentence, what the real concern is: usually hand-feel or shade tone that nobody has put into words yet.
Written as general textile practice and reviewed by four independent AI models. Not yet signed off by a human subject-matter expert. Upload your own SOPs and standards, and every answer shows which source it used.
Ten questions it ships with
The template’s starter questions. Your team can edit them, or ask in its own words.
Order status against the T&A calendar
Where does this order stand against its T&A calendar? List every milestone with its planned and actual date, and flag the ones already late or at risk.
What the current tech pack specifies
What does the current tech pack version specify for this style’s construction, measurements and trims? Cite the version and date you are reading from.
What changed between tech pack versions
Compare the latest tech pack for this style with the previous version and list exactly what changed — measurements, trims, construction, or packing.
Samples pending with the buyer
Which samples for this buyer are still awaiting approval, when were they dispatched, and how long has each been outstanding?
Orders exposed by a fabric delay
If fabric delivery for this order slips by one week, which downstream milestones and which other orders are affected? Show the dependency chain from the records on file.
Draft a buyer status update
Draft a status update for this buyer covering production progress, sample status and shipment plan. Use only what is on record, and mark anything you could not verify.
BOM against the costing sheet
Compare this style’s BOM with its costing sheet and flag any component that appears in one and not the other, or whose consumption differs.
Open buyer queries and their age
List the open queries from this buyer, what each is waiting on, and how long it has been outstanding. Show the oldest first.
Orders shipping this month
Which orders are due to ship this month? Show quantity, buyer, current production stage, and whether the ship date is still achievable.
Where an order first slipped
This order is running late. Walk back through the T&A milestones and production records and tell me which stage it first slipped at, with the dates.
Merchandising: questions before a demo
Can it read our buyers’ tech packs and PO PDFs?
Yes, when the file has text in it. Upload them to the merchandising department: PDF, Word, Excel, CSV, email and plain text, up to 10 MB per file. A scanned PO, or a measurement chart pasted in as a picture, has no text to read, so ask the buyer for the original PDF or the spec sheet in Excel. The agent works from the text and tables and does not judge sketches or artwork; save an artwork-heavy tech pack without those pages if it passes 10 MB. It quotes the version and date it read, and the buyer’s file stays as sent.
Our T&A is an Excel file. Can the agent work from it?
Yes. If the T&A is a Google Sheet, connect it and the agent reads it when you ask. If it is an Excel file, upload it to the department and the agent works from that copy, so upload the new one when dates change. Keep the T&A on the first sheet of the workbook: that sheet is read as a table, the others as text. Either way, it works out plan against actual from the dates in your rows and shows what it read.
Will the agent email the buyer on its own?
No. It writes the email, to go out through Gmail or Outlook, or the WhatsApp Business message, and it waits in Mavick as an action. An admin, usually the merchandising head as department admin (some actions need an organization admin), approves or declines it, and it is sent only if approved. There is no autonomous mode, and the approval step cannot be switched off.
Does it read our buyer emails in Gmail or Outlook?
Yes, when you ask. Connect the merchandising mailbox to the department. In Gmail the agent searches for the email that answers your question, such as the last comment on a sample or a spec change; in Outlook it reads recent mail and opens the one it needs. Either way it points to the email it used. It does not watch the inbox or act on new mail by itself. A reply it drafts waits for an admin, who approves or declines it, and it is sent only if approved.
Will other departments see our costing sheets?
Not if you upload them to merchandising. Files uploaded to a department stay inside it, and the separation is built into how Mavick stores and retrieves everything: the dyeing agent cannot read your costing sheets, and people in other departments work in their own workspace. Only a file someone chooses to share across the factory is visible beyond merchandising. It works the other way too. The merchandising agent cannot read the sewing floor’s records, so production progress has to reach merchandising as a sheet or report your team keeps.
Can it tell us which orders will ship late?
It does not predict. When you ask, it compares the planned and actual dates on record for each order, marks the milestones two or more days late and lists what sits after them. It answers when someone asks; it does not check the T&A between questions or send reminders. If a date is not in your connected data, it says so instead of guessing.
Bring Merchandising. We’ll build it on the call.